Coming soon

The site is being rebuilt.

Nuxt 4, a new structure, new content — lotusia.org returns shortly. Until then, the network upgrade is what to act on.

Read the announcement

Latest release · lotusd v12.1.0

Required before the gate

Required

From the 2nd Kings boundary, v12.0.x enforces a different signature rule and a mixed network splits. Install v12.1.0 on every node before 21 December.

All downloads & ARM builds

Unsigned builds — your OS will warn on first launch. Checksums in SHA256SUMS.

Winter Solstice 2026

2nd Kings

Scheduled

The gate the v12.1.0 upgrade must precede. Everything scheduled here activates 21 Dec 2026.

Activates
21 Dec 2026 · 20:50 UTC
Countdown
27d 14h 53m 23s

Median time past 1797886200 — the boundary is the median of the last eleven block timestamps, so the first block lands minutes after the wall-clock instant.

  • Replay protection. Restored to this boundary by v12.1.0: every signature commits the chain fork ID 0x4c4f54, so a transaction signed for this chain is invalid on any other.
  • Miner fund. One required payout address for the epoch, paid as a fan-out — byte-identical to cycling at n == 1.
  • Already active. The strict coinbase commitment has run at every height since v12.0.1, not from activation; custom coinbases keep emitting OP_RETURN "logos" <height>.