
Coming soon
The site is being rebuilt.
Nuxt 4, a new structure, new content — lotusia.org returns shortly. Until then, the network upgrade is what to act on.
Read the announcementLatest release · lotusd v12.1.0
Required before the gate
Required
From the 2nd Kings boundary, v12.0.x enforces a different signature rule and a mixed network splits. Install v12.1.0 on every node before 21 December.
All downloads & ARM buildsUnsigned builds — your OS will warn on first launch. Checksums in SHA256SUMS.
Winter Solstice 2026
2nd Kings
Scheduled
The gate the v12.1.0 upgrade must precede. Everything scheduled here activates 21 Dec 2026.
- Activates
- 21 Dec 2026 · 20:50 UTC
- Countdown
- 27d 14h 53m 23s
Median time past 1797886200 — the boundary is the median of the last eleven block timestamps, so the first block lands minutes after the wall-clock instant.
- Replay protection. Restored to this boundary by v12.1.0: every signature commits the chain fork ID 0x4c4f54, so a transaction signed for this chain is invalid on any other.
- Miner fund. One required payout address for the epoch, paid as a fan-out — byte-identical to cycling at n == 1.
- Already active. The strict coinbase commitment has run at every height since v12.0.1, not from activation; custom coinbases keep emitting OP_RETURN "logos" <height>.
